Mr. Ken Frederick Scheepers, ex-General Manager and Board member of CPMZ, and Mr. John Neville, ex-Operations Manager

Soil compacting in the pipeline trench after repair operations

Workers at the CPMZ terminal in Feruka (Mutare, Zimbabwe)

Welded pipe about to be placed in the trench (Baixa do Púnguè, 2015)

Routine training for pipeline welders at Maforga

Pumping command and monitoring console at the CPMZ terminal in Feruka

Workers removing the pipeline cleaning PIG on the reception ramp of the Maforga platform

Instrument calibration in the outflow section of the Maforga station

Beira station workers at the northern entrance to the pumping platform

Maforga station workers at the southern entrance to the pumping platform

Beira station manifold

Distributed control system panel at the Feruka terminal, in Zimbabwe

Support pillars for the roof of the new pumping platform at Beira

Panoramic view of the Maforga pumping station in Manica

Aerial view of the work to install pipes at the new Maforga platform in Manica

Topographical study for the layout of the infrastructure of the new Maforga platform

Pipes and valves for installing the pipe system at the new Maforga platform

Serial pumping

CPMZ has been working on a new serial pumping project since 2022 in cooperation with PZL, the company that operates the Feruka-Harare pipeline. The goal is to establish an interconnection between the CPMZ pipeline (Beira-Feruka) and the PZL pipeline (Feruka-Harare) as if they were one single infrastructure.

The new Beira-Harare arrangement will make it possible to have greater flexibility for transport operations by responding more efficiently to different needs: the fuel injected at the port of Beira can be unloaded directly in Harare, directly in Feruka, or have a mixed-distribution model (part of the product stays in the Feruka tanks and part is transported to Harare).

Just like the installed capacity expansion project, the serial pumping project will help realise CPMZ’s strategic vision and improve the supply from Beira to the hinterland via Harare.

Future arrangement of the pipeline in a serial pumping system with the CPMZ-PZL interconnection.