Realising this common vision requires the following:
- Expanding the existing capacity of the CPMZ pipeline (Beira-Feruka)
Since 2018, we have been implementing a multi-phase capacity expansion project. The goal is to increase capacity from two to five million cubic metres per year with the possibility of accommodating even greater demand without having to stop pumping.
. - Connecting the CPMZ pipeline (Beira-Feruka) and the PZL pipeline (Feruka-Harare)
A new serial pumping project is being designed by CPMZ and PZL to interconnect the pipelines. This unique arrangement will allow for the transportation of the fuel to Harare to be improved with no efficiency or time losses.
. - Developing Harare as a distribution hub
CPMZ and the Government of Zimbabwe have agreed on a commitment to develop Harare’s positioning as a strategic distribution hub for the hinterland. The project includes improvements in the planning, transport and unloading of petroleum products, among other measures.