{"id":1534,"date":"2026-08-04T09:28:32","date_gmt":"2026-08-04T09:28:32","guid":{"rendered":"https:\/\/cpmz.co.mz\/noticias\/o-futuro-do-corredor-da-beira-da-mais-um-passo-decisivo-no-proximo-dia-2-de-setembro\/"},"modified":"2026-08-04T11:45:03","modified_gmt":"2026-08-04T11:45:03","slug":"the-future-of-the-beira-corridor-takes-another-decisive-step-on-2-september","status":"publish","type":"noticias","link":"https:\/\/cpmz.co.mz\/en\/news\/the-future-of-the-beira-corridor-takes-another-decisive-step-on-2-september\/","title":{"rendered":"The Future Of The Beira Corridor Takes Another Decisive Step On 2nd September"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">In just one month&#8217;s time, CPMZ will mark the groundbreaking of two new pumping stations, an investment that will support the next increase in the capacity of the Companhia do Pipeline Mo\u00e7ambique-Zimbabwe (CPMZ) pipeline.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This second phase of CPMZ&#8217;s Expansion Plan will increase the capacity of the Beira\u2013Feruka pipeline to 5 million m\u00b3 of fuel per year, building on the first phase completed in 2024, which increased capacity from 2 to 3 million m\u00b3 annually.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/08\/Foto-2-1024x576.jpg\" alt=\"\" class=\"wp-image-1525\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/08\/Foto-2-1024x576.jpg 1024w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/08\/Foto-2-300x169.jpg 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/08\/Foto-2-768x432.jpg 768w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/08\/Foto-2-1536x864.jpg 1536w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/08\/Foto-2-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\" style=\"font-size:15px\"><em><em>Pipeline platform refurbishment works \u2014 2022<\/em><\/em><\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The new pumping stations, located in Nhamatanda (Sofala Province) and Messica (Manica Province), will further strengthen the pipeline&#8217;s role as a strategic asset of the Beira Corridor and a key contributor to energy security across Southern Africa.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At the same time, Petrozim Line (PZL) is carrying out a matching expansion of the Feruka\u2013Harare section through a coordinated programme with synchronised implementation schedules.<br><\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/08\/Foto-3-1024x576.jpg\" alt=\"\" class=\"wp-image-1527\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/08\/Foto-3-1024x576.jpg 1024w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/08\/Foto-3-300x169.jpg 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/08\/Foto-3-768x432.jpg 768w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/08\/Foto-3-1536x864.jpg 1536w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/08\/Foto-3-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\" style=\"font-size:15px\"><em><em>CPMZ working on the pipeline valves and piping \u2014 2022<\/em><\/em><\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\">The September 2<sup>nd<\/sup> ceremony marks another milestone in strengthening the Beira Corridor as the safest, most efficient and competitive logistics solution for supplying Zimbabwe, Zambia, Malawi, the DRC, Botswana and the wider hinterland.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">More updates on this important milestone for the future of the Beira Corridor will soon be shared.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In just one month&#8217;s time, CPMZ will mark the groundbreaking of two new pumping stations, an investment that will support the next increase in the capacity of the Companhia do Pipeline Mo\u00e7ambique-Zimbabwe (CPMZ) pipeline.<\/p>\n","protected":false},"featured_media":1524,"template":"","meta":{"_acf_changed":false},"class_list":["post-1534","noticias","type-noticias","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/cpmz.co.mz\/en\/wp-json\/wp\/v2\/noticias\/1534","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cpmz.co.mz\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/cpmz.co.mz\/en\/wp-json\/wp\/v2\/types\/noticias"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cpmz.co.mz\/en\/wp-json\/wp\/v2\/media\/1524"}],"wp:attachment":[{"href":"https:\/\/cpmz.co.mz\/en\/wp-json\/wp\/v2\/media?parent=1534"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}