{"id":842,"date":"2025-05-04T09:18:09","date_gmt":"2025-05-04T09:18:09","guid":{"rendered":"https:\/\/cpmz.co.mz\/operacoes\/"},"modified":"2026-03-24T19:00:19","modified_gmt":"2026-03-24T19:00:19","slug":"operations","status":"publish","type":"page","link":"https:\/\/cpmz.co.mz\/en\/what-we-do\/operations\/","title":{"rendered":"Operations"},"content":{"rendered":"\n\n<div  class=\"banner-title\">\n            <div class=\"banner-image \">\n            <img decoding=\"async\" width=\"2560\" height=\"1437\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/03\/1-8-1-scaled.jpg\" class=\"attachment-full size-full\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/03\/1-8-1-scaled.jpg 2560w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/03\/1-8-1-300x168.jpg 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/03\/1-8-1-1024x575.jpg 1024w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/03\/1-8-1-768x431.jpg 768w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/03\/1-8-1-1536x862.jpg 1536w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2026\/03\/1-8-1-2048x1150.jpg 2048w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/>        <\/div>\n        \n                \n    <div class=\"banner-content\">\n        <h1>Operations<\/h1>\n    <\/div>\n<\/div>\n\n\n\n<div  class=\"title-description-big\">\n                        <h2 class=\"title\">40 years complying with the highest international standards.<\/h2>\n                \n                    <div class=\"description\">\n                <p><strong>CPMZ\u2019s operations are focused on the management and upkeep of the pipeline that links the port of Beira to Feruka in Zimbabwe and ensure optimum safety and reliability conditions. Its excellent performance is based on a successful combination: state-of-the-art technology, robust infrastructure and highly qualified teams.<\/strong><\/p>\n<p>We strive for ongoing improvement in the quality of the service we provide and ongoing monitoring of the best practices applied in this industry. CPMZ renovated the pipeline completely between 2008 and 2014 and, since 2018, it has been working on a project to gradually increase the number of cubic metres it can transport.<\/p>\n            <\/div>\n                    <\/div>\n\n\n\n<div  class=\"title-description-big with-lateral-link link-bottom-position\">\n                                <h2 class=\"title gray-underline\">World-class technology<\/h2>\n                        <div class=\"content-wrapper\">\n            <div class=\"text-content\">\n                                    <div class=\"description\">\n                        <p>We receive the fuel directly at the port of Beira and, by means of pumping operations backed by a strict control system, we transport the product to Feruka, in Zimbabwe, through a 294-kilometre pipeline of 10 inches in diameter. Besides the pipeline, CPMZ\u2019s assets include pumping stations at Beira and Maforga (Manica) and administrative facilities in Beira and Maputo, as well as a reception terminal at Feruka, in Zimbabwe.<\/p>\n<p>Along the entire fuel transport line, the pumps and equipment used by CPMZ meet the highest engineering standards. It has a complex fuel pumping infrastructure with equipment and systems based on cutting-edge technologies, a world industry benchmark in hydrocarbon processing and transport facilities.<\/p>\n<p>We guarantee real-time monitoring of the pipeline and everything that happens in the pumping stations by using an advanced control system for pumping operations. Our system has three technological aspects:<\/p>\n<ol>\n<li><strong>Extremely reliable hardware.<br \/>\n<span style=\"color: #ffffff;\">.<\/span><\/strong><\/li>\n<li><strong>Software based on SCADA<\/strong> (Supervisory Control And Data Acquisition) technologies, internationally recognised for their ability to transform industrial system monitoring data into intelligent information to support decision-making, effective control and critical event management.<br \/>\n<span style=\"color: #ffffff;\">.<\/span><\/li>\n<li><strong>Modern telemetry system. <\/strong>Our high-tech operations are carried out by an experienced and highly qualified team. Circa 30% of CPMZ\u2019s employees are technical staff. This high level of technical know-how bolsters our in-house ability to make repairs and deal with other maintenance needs.<\/li>\n<\/ol>\n<p>In this mix of experience and innovation, CPMZ\u2019s history is testimony to the reliability of our operations which are designed to cope with unforeseen events. The quality of the assets, remote monitoring of the entire pipeline and teams that are always ready minimise the risk of failures and guarantee an immediate response in different scenarios. After Cyclone Idai destroyed much of the Beira area in 2019, CPMZ was able to resume operations in just 10 days.<\/p>\n<p>Our operations are fully certified at the environmental and energy level, in accordance with the applicable legal requirements.<\/p>\n                    <\/div>\n                                            <\/div>\n            \n                            <div class=\"lateral-link-container link-bottom-position\">\n                    <a href=\"https:\/\/cpmz.co.mz\/en\/who-we-are\/our-history\/\" class=\"featured-link\" >\n                        Learn more about our history                    <\/a>\n                <\/div>\n                    <\/div>\n    <\/div>\n\n\n\n<div  class=\"title-description-big with-lateral-link link-bottom-position\">\n                                <h2 class=\"title gray-underline\">Serial pumping<\/h2>\n                        <div class=\"content-wrapper\">\n            <div class=\"text-content\">\n                                    <div class=\"description\">\n                        <p>CPMZ has been working on a new serial pumping project since 2022 in cooperation with PZL, the company that operates the Feruka-Harare pipeline. The goal is to establish an interconnection between the CPMZ pipeline (Beira-Feruka) and the PZL pipeline (Feruka-Harare) as if they were one single infrastructure.<\/p>\n<p>The new Beira-Harare arrangement will make it possible to have greater flexibility for transport operations by responding more efficiently to different needs: the fuel injected at the port of Beira can be unloaded directly in Harare, directly in Feruka, or have a mixed-distribution model (part of the product stays in the Feruka tanks and part is transported to Harare).<\/p>\n<p>Just like the installed capacity expansion project, the serial pumping project will help realise CPMZ\u2019s strategic vision and improve the supply from Beira to the hinterland via Harare.<\/p>\n                    <\/div>\n                                            <\/div>\n            \n                    <\/div>\n    <\/div>\n\n\n\n    <div  class=\"image-slider\">\n        <div class=\"slider-container\">\n            <div class=\"slider-wrapper\">\n                                                            <div class=\"slide\">\n                            <div class=\"slide-image\">\n                                <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"398\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Ken-Scheepers-ex-Director-Geral-e-Administrador-da-CPMZ-e-John-Neville-ex-Director-de-Operacoes.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Ken-Scheepers-ex-Director-Geral-e-Administrador-da-CPMZ-e-John-Neville-ex-Director-de-Operacoes.webp 973w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Ken-Scheepers-ex-Director-Geral-e-Administrador-da-CPMZ-e-John-Neville-ex-Director-de-Operacoes-300x187.webp 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Ken-Scheepers-ex-Director-Geral-e-Administrador-da-CPMZ-e-John-Neville-ex-Director-de-Operacoes-768x478.webp 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                            <\/div>\n                                                            <div class=\"slide-description\">\n                                    <p>Mr. Ken Frederick Scheepers, ex-General Manager and Board member of CPMZ, and Mr. John Neville, ex-Operations Manager<\/p>\n                                <\/div>\n                                                    <\/div>\n                                                                                <div class=\"slide\">\n                            <div class=\"slide-image\">\n                                <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"397\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-1.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-1.webp 975w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-1-300x186.webp 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-1-768x477.webp 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                            <\/div>\n                                                            <div class=\"slide-description\">\n                                    <p>Soil compacting in the pipeline trench after repair operations<\/p>\n                                <\/div>\n                                                    <\/div>\n                                                                                <div class=\"slide\">\n                            <div class=\"slide-image\">\n                                <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"397\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-2.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-2.webp 975w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-2-300x186.webp 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-2-768x477.webp 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                            <\/div>\n                                                            <div class=\"slide-description\">\n                                    <p>Workers at the CPMZ terminal in Feruka (Mutare, Zimbabwe)<\/p>\n                                <\/div>\n                                                    <\/div>\n                                                                                <div class=\"slide\">\n                            <div class=\"slide-image\">\n                                <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"397\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-3.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-3.webp 975w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-3-300x186.webp 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-3-768x477.webp 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                            <\/div>\n                                                            <div class=\"slide-description\">\n                                    <p>Welded pipe about to be placed in the trench (Baixa do P\u00fangu\u00e8, 2015)<\/p>\n                                <\/div>\n                                                    <\/div>\n                                                                                <div class=\"slide\">\n                            <div class=\"slide-image\">\n                                <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"397\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-4.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-4.webp 975w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-4-300x186.webp 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-4-768x477.webp 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                            <\/div>\n                                                            <div class=\"slide-description\">\n                                    <p>Routine training for pipeline welders at Maforga<\/p>\n                                <\/div>\n                                                    <\/div>\n                                                                                <div class=\"slide\">\n                            <div class=\"slide-image\">\n                                <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"397\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-5.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-5.webp 975w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-5-300x186.webp 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-5-768x477.webp 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                            <\/div>\n                                                            <div class=\"slide-description\">\n                                    <p>Pumping command and monitoring console at the CPMZ terminal in Feruka<\/p>\n                                <\/div>\n                                                    <\/div>\n                                                                                <div class=\"slide\">\n                            <div class=\"slide-image\">\n                                <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"397\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-6.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-6.webp 975w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-6-300x186.webp 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-6-768x477.webp 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                            <\/div>\n                                                            <div class=\"slide-description\">\n                                    <p>Workers removing the pipeline cleaning PIG on the reception ramp of the Maforga platform<\/p>\n                                <\/div>\n                                                    <\/div>\n                                                                                <div class=\"slide\">\n                            <div class=\"slide-image\">\n                                <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"397\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-7.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-7.webp 975w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-7-300x186.webp 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-7-768x477.webp 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                            <\/div>\n                                                            <div class=\"slide-description\">\n                                    <p>Instrument calibration in the outflow section of the Maforga station<\/p>\n                                <\/div>\n                                                    <\/div>\n                                                                                <div class=\"slide\">\n                            <div class=\"slide-image\">\n                                <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"397\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-8.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-8.webp 975w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-8-300x186.webp 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-8-768x477.webp 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                            <\/div>\n                                                            <div class=\"slide-description\">\n                                    <p>Beira station workers at the northern entrance to the pumping platform<\/p>\n                                <\/div>\n                                                    <\/div>\n                                                                                <div class=\"slide\">\n                            <div class=\"slide-image\">\n                                <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"397\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-9.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-9.webp 975w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-9-300x186.webp 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-9-768x477.webp 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                            <\/div>\n                                                            <div class=\"slide-description\">\n                                    <p>Maforga station workers at the southern entrance to the pumping platform<\/p>\n                                <\/div>\n                                                    <\/div>\n                                                                                <div class=\"slide\">\n                            <div class=\"slide-image\">\n                                <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"397\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-10.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-10.webp 975w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-10-300x186.webp 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-10-768x477.webp 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                            <\/div>\n                                                            <div class=\"slide-description\">\n                                    <p>Beira station manifold<\/p>\n                                <\/div>\n                                                    <\/div>\n                                                                                <div class=\"slide\">\n                            <div class=\"slide-image\">\n                                <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"397\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-11.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-11.webp 975w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-11-300x186.webp 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-1-operacoes-desktop-11-768x477.webp 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                            <\/div>\n                                                            <div class=\"slide-description\">\n                                    <p>Distributed control system panel at the Feruka terminal, in Zimbabwe<\/p>\n                                <\/div>\n                                                    <\/div>\n                                                <\/div>\n            <button class=\"slider-arrow slider-prev\" aria-label=\"Previous slide\">\n                <img decoding=\"async\" src=\"https:\/\/cpmz.co.mz\/wp-content\/themes\/cpmz\/images\/image-slider-arrow-left.svg\" alt=\"Previous\">\n            <\/button>\n            <button class=\"slider-arrow slider-next\" aria-label=\"Next slide\">\n                <img decoding=\"async\" src=\"https:\/\/cpmz.co.mz\/wp-content\/themes\/cpmz\/images\/image-slider-arrow-right.svg\" alt=\"Next\">\n            <\/button>\n        <\/div>\n    <\/div>\n\n\n\n<div  class=\"title-description-big with-lateral-link link-bottom-position\">\n                                <h2 class=\"title\">Expanding operations<\/h2>\n                        <div class=\"content-wrapper\">\n            <div class=\"text-content\">\n                                    <div class=\"description\">\n                        <p style=\"text-align: left;\">Expanding the installed capacity of the pipeline is a priority goal for CPMZ and is based on our shared strategic vision with the Zimbabwean Government: to make the Beira-Harare pipeline the preferred transporter of refined products for the Southern African hinterland. Realising this vision is essential for CPMZ\u2019s performance, the competitiveness of the hinterland, and generating more added value for the Mozambican economy.<\/p>\n<p>From 1.6 to over 5 million cubic metres of installed capacity. Find out how our operations are progressing with a multi-phase a gradual expansion project:<\/p>\n<p style=\"text-align: left;\"><span style=\"color: #808080;\"><strong>Capacidade inicial: 1,6 milh\u00f5es m\u00b3\/ano<\/strong><\/span><\/p>\n                    <\/div>\n                                                                            <div class=\"text-blocks description\">\n                            <h2 style=\"text-align: left;\"><strong>Phase 0<\/strong><\/h2>\n<p style=\"text-align: left;\"><strong>2014<\/strong><br \/>\nApplying a drag-reducing agent (DRA) on the inside of the pipeline to speed up the flow of fuel in the pipeline.<\/p>\n<h4 style=\"text-align: left;\"><span style=\"color: #808080;\"><strong>Installed capacity: 2 million<\/strong> m\u00b3\/year<\/span><\/h4>\n                        <\/div>\n                                            <div class=\"text-blocks description\">\n                            <h2 style=\"text-align: left;\"><strong>Phase 1<\/strong><\/h2>\n<p style=\"text-align: left;\"><strong>2018-2023<\/strong><br \/>\nExpanding capacity through the construction of new pumping platforms and control rooms at the Beira and Maforga stations.<br \/>\nConstruction completed by 2023 and new capacity inaugurated in 2024.<\/p>\n<h4 style=\"text-align: left;\"><span style=\"color: #808080;\"><strong>Installed capacity: <\/strong><\/span><span style=\"color: #808080;\"><strong> 3 million m\u00b3\/year<br \/>\n<\/strong><\/span><\/h4>\n                        <\/div>\n                                            <div class=\"text-blocks description\">\n                            <h2 style=\"text-align: left;\"><strong>Phase 2<\/strong><\/h2>\n<p style=\"text-align: left;\"><strong>Beginning of Phase 2 of the pipeline expansion project<\/strong><br \/>\nOngoing detailed engineering study.<br \/>\nIncorporating two new satellite stations into CPMZ\u2019s integrated pumping infrastructure, Phase 2 expected conclusion by late 2027.<\/p>\n<h4 style=\"text-align: left;\"><span style=\"color: #808080;\"><strong>Installed capacity: 5<\/strong><\/span><span style=\"color: #808080;\"><strong>\u00a0million m\u00b3\/year<\/strong><\/span><\/h4>\n<h4 style=\"text-align: left;\"><span style=\"color: #808080;\"><strong>\u00a0<\/strong><\/span><\/h4>\n                        <\/div>\n                                            <div class=\"text-blocks description\">\n                            <h2 style=\"text-align: left;\"><strong>Additional phase<\/strong><\/h2>\n<p style=\"text-align: left;\">Replacing the current 10-inch pipe with a larger pipe in a scenario where demand exceeds 5 million m3\/year. The way CPMZ\u2019s infrastructure is implemented allows this replacement to be done simply and without having to stop pumping operations.<\/p>\n<h4 style=\"text-align: left;\"><span style=\"color: #808080;\"><strong>Installed capacity: above 5 million<\/strong> m\u00b3\/year<\/span><\/h4>\n<p>&nbsp;<\/p>\n                        <\/div>\n                                                <\/div>\n            \n                            <div class=\"lateral-link-container link-bottom-position\">\n                    <a href=\"https:\/\/cpmz.co.mz\/en\/what-we-do\/vision\/\" class=\"featured-link\" >\n                        Find out more about our strategic vision                    <\/a>\n                <\/div>\n                    <\/div>\n    <\/div>\n\n\n\n    <div  class=\"image-slider\">\n        <div class=\"slider-container\">\n            <div class=\"slider-wrapper\">\n                                                            <div class=\"slide\">\n                            <div class=\"slide-image\">\n                                <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"397\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-2-operacoes-desktop-1.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-2-operacoes-desktop-1.webp 975w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-2-operacoes-desktop-1-300x186.webp 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-2-operacoes-desktop-1-768x477.webp 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                            <\/div>\n                                                            <div class=\"slide-description\">\n                                    <p>Support pillars for the roof of the new pumping platform at Beira<\/p>\n                                <\/div>\n                                                    <\/div>\n                                                                                <div class=\"slide\">\n                            <div class=\"slide-image\">\n                                <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"397\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/DJI_0235.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/DJI_0235.webp 975w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/DJI_0235-300x186.webp 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/DJI_0235-768x477.webp 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                            <\/div>\n                                                            <div class=\"slide-description\">\n                                    <p>Panoramic view of the Maforga pumping station in Manica<\/p>\n                                <\/div>\n                                                    <\/div>\n                                                                                <div class=\"slide\">\n                            <div class=\"slide-image\">\n                                <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"397\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-2-operacoes-desktop-3.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-2-operacoes-desktop-3.webp 975w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-2-operacoes-desktop-3-300x186.webp 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-2-operacoes-desktop-3-768x477.webp 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                            <\/div>\n                                                            <div class=\"slide-description\">\n                                    <p>Aerial view of the work to install pipes at the new Maforga platform in Manica<\/p>\n                                <\/div>\n                                                    <\/div>\n                                                                                <div class=\"slide\">\n                            <div class=\"slide-image\">\n                                <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"397\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-2-operacoes-desktop-4.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-2-operacoes-desktop-4.webp 975w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-2-operacoes-desktop-4-300x186.webp 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-2-operacoes-desktop-4-768x477.webp 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                            <\/div>\n                                                            <div class=\"slide-description\">\n                                    <p>Topographical study for the layout of the infrastructure of the new Maforga platform<\/p>\n                                <\/div>\n                                                    <\/div>\n                                                                                <div class=\"slide\">\n                            <div class=\"slide-image\">\n                                <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"397\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-2-operacoes-desktop-5.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-2-operacoes-desktop-5.webp 975w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-2-operacoes-desktop-5-300x186.webp 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/Interior-slider-2-operacoes-desktop-5-768x477.webp 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                            <\/div>\n                                                            <div class=\"slide-description\">\n                                    <p>Pipes and valves for installing the pipe system at the new Maforga platform<\/p>\n                                <\/div>\n                                                    <\/div>\n                                                <\/div>\n            <button class=\"slider-arrow slider-prev\" aria-label=\"Previous slide\">\n                <img decoding=\"async\" src=\"https:\/\/cpmz.co.mz\/wp-content\/themes\/cpmz\/images\/image-slider-arrow-left.svg\" alt=\"Previous\">\n            <\/button>\n            <button class=\"slider-arrow slider-next\" aria-label=\"Next slide\">\n                <img decoding=\"async\" src=\"https:\/\/cpmz.co.mz\/wp-content\/themes\/cpmz\/images\/image-slider-arrow-right.svg\" alt=\"Next\">\n            <\/button>\n        <\/div>\n    <\/div>\n\n\n\n<div  class=\"title-description-big\">\n                        <h2 class=\"title gray-underline\">Serial pumping<\/h2>\n                \n                    <div class=\"description\">\n                <p>CPMZ has been working on a new serial pumping project since 2022 in cooperation with PZL, the company that operates the Feruka-Harare pipeline. The goal is to establish an interconnection between the CPMZ pipeline (Beira-Feruka) and the PZL pipeline (Feruka-Harare) as if they were one single infrastructure.<\/p>\n<p>The new Beira-Harare arrangement will make it possible to have greater flexibility for transport operations by responding more efficiently to different needs: the fuel injected at the port of Beira can be unloaded directly in Harare, directly in Feruka, or have a mixed-distribution model (part of the product stays in the Feruka tanks and part is transported to Harare).<\/p>\n<p>Just like the installed capacity expansion project, the serial pumping project will help realise CPMZ\u2019s strategic vision and improve the supply from Beira to the hinterland via Harare.<\/p>\n            <\/div>\n                    <\/div>\n\n\n\n<div id=\"image-small-description\" class=\"image-small-description\">\n            <div class=\"image-wrapper\">\n            <img decoding=\"async\" width=\"2560\" height=\"1181\" src=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/InfoGrafeng2-scaled.png\" class=\"attachment-full size-full\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/InfoGrafeng2-scaled.png 2560w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/InfoGrafeng2-300x138.png 300w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/InfoGrafeng2-1024x473.png 1024w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/InfoGrafeng2-768x354.png 768w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/InfoGrafeng2-1536x709.png 1536w, https:\/\/cpmz.co.mz\/wp-content\/uploads\/2025\/05\/InfoGrafeng2-2048x945.png 2048w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/>        <\/div>\n        \n            <div class=\"description\">\n            Future arrangement of the pipeline in a serial pumping system with the CPMZ-PZL interconnection.        <\/div>\n    <\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":1353,"parent":872,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-842","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/cpmz.co.mz\/en\/wp-json\/wp\/v2\/pages\/842","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cpmz.co.mz\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/cpmz.co.mz\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/cpmz.co.mz\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cpmz.co.mz\/en\/wp-json\/wp\/v2\/comments?post=842"}],"version-history":[{"count":32,"href":"https:\/\/cpmz.co.mz\/en\/wp-json\/wp\/v2\/pages\/842\/revisions"}],"predecessor-version":[{"id":1420,"href":"https:\/\/cpmz.co.mz\/en\/wp-json\/wp\/v2\/pages\/842\/revisions\/1420"}],"up":[{"embeddable":true,"href":"https:\/\/cpmz.co.mz\/en\/wp-json\/wp\/v2\/pages\/872"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cpmz.co.mz\/en\/wp-json\/wp\/v2\/media\/1353"}],"wp:attachment":[{"href":"https:\/\/cpmz.co.mz\/en\/wp-json\/wp\/v2\/media?parent=842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}